Materials processing and joining

Arc welding is carried out at a voltage of 25 V, a current of 200 A and a welding speed of 300 mm/min. With an arc thermal efficiency of 0.80, which value is closest to the heat input per mm of weld, Q = ηVI/v?

  1. AAbout 13 J/mm
  2. BAbout 0.80 kJ/mm
  3. CAbout 1.0 kJ/mm
Show answer and explanation

Answer: B. About 0.80 kJ/mm

Converting the welding speed to per second gives v = 300/60 = 5.0 mm/s. The arc power is VI = 25 × 200 = 5000 W, so Q = 0.80 × 5000/5.0 = 800 J/mm = 0.80 kJ/mm. About 1.0 kJ/mm forgets to multiply by the thermal efficiency, and about 13 J/mm divides by the per-minute value of 300 as is. A larger heat input slows the cooling of the weld, making the heat-affected zone less likely to harden, but it lengthens the time at high temperature, so grains can coarsen and toughness can fall. Upper and lower limits on heat input are therefore set according to the type of steel to control the cooling rate.

Report an error

Practice this topic Back to topic

More Materials processing and joining questions

  1. In welding high-strength steel, preheating is used to prevent cold cracking (hydrogen cracking), which appears in the heat-affected zone and elsewhere within minutes to days after welding. Which statement correctly describes the effect of preheating?
  2. When austenitic stainless steels such as SUS304 are welded, intergranular corrosion can occur in the heat-affected zone a short distance from the weld line (weld decay). Which combination of cause and countermeasure is correct?
  3. Which statement correctly describes the features of friction stir welding (FSW)?
  4. A green compact at 70% relative density is sintered to 95% relative density. Assuming isotropic shrinkage and no change in mass, which value is closest to the linear shrinkage (fractional decrease in length) due to sintering?
  5. To make WC–Co cemented carbide, WC powder is mixed with Co powder, compacted and sintered. Which statement correctly describes this sintering?