On the evening of December 15, 1967, the U.S. 35 bridge over the Ohio River (the Silver Bridge) collapsed and 46 people died. The collapse began when one eyebar, a bar with an eye at each end that formed the bridge’s suspension chain, fractured at its eye. At the origin was a small crack, less than about 3 mm deep, that had grown by stress corrosion and related processes over about 40 years.
What happened
- Date
- December 15, 1967, at about 5 p.m. (EST)
- Location
- U.S. 35 bridge over the Ohio River between Point Pleasant, West Virginia, and Kanauga, Ohio, USA
- Structure
- Eyebar chain suspension bridge designed in 1927 and opened in 1928. Each chain link was a pair of heat-treated 2 × 12 in bars
- Casualties
- 31 of the 37 vehicles on the bridge fell with it; 46 people died and 9 were injured
- Origin
- Lower limb of the eye of eyebar 330 at joint C13N of the north chain, Ohio side span
- Investigation
- U.S. National Transportation Safety Board (NTSB), report NTSB-HAR-71-1; metallurgical report of the National Bureau of Standards (NBS)
Sequence of events and the investigation’s findings
The collapse happened at about 5 p.m. According to the NTSB, once the north chain separated, the collapse spread across the whole bridge in about one minute.
The NTSB found that the collapse was caused by a cleavage fracture in the lower limb of the eye of eyebar 330 at joint C13N. The fracture resulted from a critical-size flaw that developed over the 40-year life of the structure through the joint action of stress corrosion and corrosion fatigue. The flaw was inaccessible to visual inspection and, the NTSB said, could not have been detected by any inspection method then known without disassembling the eyebar joint.
The chain of causes from the materials side
The eyebar steel was a carbon steel with about 0.6% carbon and no significant alloying element other than manganese, water-quenched and tempered at about 1150–1200 °F (about 620–650 °C).
In the National Bureau of Standards (NBS) metallurgical examination, the fracture of the lower side of the eye started from pre-existing cracks at the surface of the hole, less than 1/8 in (about 3.2 mm) deep. All the crack origins were in severely corroded areas, and many other cracks nearby that were not part of the fracture were filled with oxide, showing that they had been held open by tensile stress for a long time. The lower side of the eye broke without appreciable plastic deformation, and the upper side then failed by excessive load with extensive bending.
University teaching material (the Open University) explains that the eyebar steel had low toughness at the near-freezing temperatures on the night of the disaster, making it susceptible to brittle fracture; with low toughness, even a small crack is critical. Each link was a pair of bars, and when one broke, the remaining bar slipped off the pin: the non-redundant structure collapsed completely.
On interpretations of the cause: the NTSB attributes the crack growth to “the joint action of stress corrosion and corrosion fatigue”, while Part I of the National Bureau of Standards report finds the cracks similar to those caused by stress corrosion in other steels and says the evidence suggests stress corrosion rather than fatigue.
The clues that revealed the cause
- The lower side of the eye broke without obvious plastic deformation Deformation at the fracture: Almost none (the pieces f…
- The origin fracture was a cleavage fracture (NTSB) Fracture surface and crack features: Flat, shiny facets (cleav…
- At the origin were pre-existing cracks less than about 3 mm deep, and many cracks nearby were filled with oxide Fracture surface and crack features
- The eyebar chains held the bridge up and were always in tension (university course material) Loading: Steady load (self-weight,…
- The eyebars were heat-treated carbon steel Material: Ordinary carbon or low-al…
- The night of the collapse was near freezing (university teaching material) Service temperature: Low (below about 0 °C)
- Water could pool at the bottom of the eye, combining tensile residual stress with a corrosive environment (university teaching material) Environment: Water, humidity or conden…
- The structure had been in service for about 40 years Time to failure: Years or more
Open the guide with this case’s clues
Opening the guide with these clues ranks brittle fracture, the final mode of failure, at the top, followed by hydrogen embrittlement and stress corrosion cracking. External clues alone cannot separate these two; only examining the origin crack itself reveals the mechanism. In this accident, the National Bureau of Standards examination found that the evidence suggested stress corrosion rather than fatigue.
Related failure modes: Brittle fracture / Stress corrosion cracking
What changed afterwards: design, rules and inspection
- The Federal-Aid Highway Act of August 23, 1968, directed the Secretary of Transportation to establish national bridge inspection standards covering inspection methods, maximum intervals and inspector qualifications.
- The National Bridge Inspection Standards (NBIS) became a regulation on April 27, 1971, requiring bridges and their components to be inspected at least once every 2 years.
- In 1988, requirements were added for inspecting bridges with fracture-critical members, whose failure could bring a bridge down.
- The NTSB recommended research into the failure mechanisms, extending the 1968 Act’s bridge safety requirements to all highway bridges, and federal aid for repairs.
Lessons
- The cause becomes clear only when you examine not just the brittle final fracture but the mechanism of the small crack at its origin (here, stress corrosion and related processes).
- In a low-toughness material, a crack of a few millimetres can be fatal. Safety depends on both crack size and toughness.
- In a non-redundant structure, where one member’s failure brings everything down, even small cracks cannot be overlooked.
- Damage in places that cannot be inspected visually will not be found by inspecting more often. Making a structure inspectable is part of design.
- When the bridge was designed in 1927, stress corrosion and corrosion fatigue of this kind of bridge material under rural atmospheric exposure were not known. Old structures need to be reassessed in the light of new knowledge.